A leaky gasket has caused a shutdown of N.B. Power’s Point Lepreau nuclear generating station, less than two weeks after the plant returned to service from a four-month-long maintenance outage. The fix is on the troubled non-nuclear side of the plant and is expected to take one month.
Nuclear generation expected to be out for a month, just weeks after 4-month maintenance outage

Erica Butler · CBC News
· Posted: Sep 01, 2026 3:54 PM EDT | Last Updated: 3 hours ago
Listen to this article
Estimated 3 minutes
The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.
Steve Bagshaw, N.B. Power’s chief nuclear officer, said the non-nuclear side of Point Lepreau has caused most of the station’s issues in the past few years. (CBC)
Less than two weeks after returning from a months-long scheduled maintenance, the Point Lepreau nuclear generating station is off-line again.
Steve Bagshaw, N.B. Power’s chief nuclear officer, said the plant was taken off-line Sunday morning for repairs to a gasket in its turbine system on the non-nuclear side of the plant.
Plant workers first discovered “some steam escaping from a gasket” on Friday and monitored it through the weekend, Bagshaw said.
The utility took a “proactive decision to take the station off-line and replace this leaking gasket,” said Bagshaw,
This story was brought to Nouzie by RSS. The original post can be found on https://www.cbc.ca/news/canada/new-brunswick/lepreau-non-nuclear-equipment-causes-another-shutdown-9.7328324?cmp=rss




