New Brunswick·New
The 30-year-contract to build and maintain the Trans-Canada Highway between Fredericton and Moncton is about to expire, and it’s causing a roadwork blitz.
Contract that financed Moncton-to-Fredercton section of Trans-Canada Highway expires in 2028

Silas Brown · CBC News
· Posted: Aug 25, 2026 5:00 AM EDT | Last Updated: 27 minutes ago
Listen to this article
Estimated 5 minutes
The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.
MRDC, the current operator of the divided highway between Fredericton and Moncton, is busy fixing up the roadway before handing responsibility for it back to the province. (Aniekan Etuhube/CBC)
Outside Oromocto, cars and trucks on the Trans-Canada Highway slow down, merge into a single lane and make their way through a canyon of orange traffic cones separating traffic from the machines laying new asphalt.
Driving among pylons has been a common experience for several years on Highway 2 between Fredericton and Moncton.
Nearly 195 kilometres of asphalt is being resurfaced as the contract with the private company that maintains the highway nears its end.
This has spurred a roadwork blitz as the Maritime Road Development Corp., known as MRDC, prepares to hand responsibility for the highway back to the province.
This story was brought to Nouzie by RSS. The original post can be found on https://www.cbc.ca/news/canada/new-brunswick/fredericton-moncton-highway-contract-expires-9.7318100?cmp=rss




