The City of Moncton has started to consider its options for mitigating the impacts of flooding, including to a berm along the waterfront or raise Assomption Boulevard that would cost up to $15 million.
Storm at high tide could mean low-lying part of downtown is flooded by end of the century
Victoria Walton · CBC News
· Posted: Nov 16, 2026 5:00 AM EST | Last Updated: 1 hour ago
Listen to this article
Estimated 6 minutes
The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.
It may not look like it right now, but the Petitcodiac River has about a one per cent chance of flooding each year. (Victoria Walton/CBC)
Sitting beside the Petitcodiac River, Moncton might not seem like a coastal city. But thanks to the tidal bore, it sees two high tides each day. With rising sea levels, those tides could increase to the point where the river will flood its banks by 2100, leaving a large part of downtown vulnerable to flooding.
“So this is part of our highest tides in the world, on the Bay of Fundy that we come out of. It might be detrimental in some ways; it can be a problem if you’re not prepared for it,” says Tim Moerman,
This story was brought to Nouzie by RSS. The original post can be found on https://www.cbc.ca/news/canada/new-brunswick/moncton-flood-mitigation-9.7421409?cmp=rss




