New plan proposed for Moncton’s crumbling Subway Block | CBC News

0 6 hours ago
new-plan-proposed-for-moncton's-crumbling-subway-block-|-cbc-newsNew plan proposed for Moncton's crumbling Subway Block | CBC News

New Brunswick

Moncton’s heritage board has given approval in principle to a proposal to rebuild the crumbling Subway Block, a part of the downtown landscape since 1917.

3-storey building on Main Street has been vacant for 15 years

Shane Magee · CBC News

· Posted: Nov 13, 2026 1:39 PM EST | Last Updated: 2 hours ago

Text to Speech Icon

Listen to this article

Estimated 5 minutes

The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.

An illustration showing a two-storey brick building with large windows and people sitting at tables.A rendering showing a proposal to rebuild the Subway Block building in downtown Moncton with two floors instead of three. (Trace Planning and Design)

Moncton’s heritage board offered initial support to a proposal to rebuild the crumbling Subway Block.

Consultants for Seville Property Group Ltd. presented the proposal to the board Thursday for the three-storey Main Street building that’s been vacant for more than 15 years.

The City of Moncton issued a notice in October 2025 requiring it to be fixed and occupied, or demolished.

The plan calls for immediate work to stabilize the structure once used for retail and office space. The next steps would be to remove the third floor, move a rear wall away from the adjacent railroad, and preserve some features. 

“The building is in rough shape,” consultant Bill Whalen said.

 » Read More


This story was brought to Nouzie by RSS. The original post can be found on https://www.cbc.ca/news/canada/new-brunswick/moncton-subway-block-building-rebuild-9.7420834?cmp=rss

Leave a Reply

Your email address will not be published. Required fields are marked *